AWWA WQTC69271 The Challenge of Upgrading the Pittsburgh Water Treatment Plant Clearwell

Conference Proceeding by American Water Works Association, 11/01/2008

Kozman, David; Roby, Chad

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This powerpoint presentation begins by presentingproject objectives that include the following:meet Pittsburgh Water continue to supply high quality water during andafter construction; and,meet current and future regulatory requirements. Topics covered include the following: existing clearwell;clearwell improvement alternatives;increased utilization of existing system storage;rehabilitation of existing clearwell; evaluation of alternatives; conclusions and recommendations; and,implementation. Includes table, figures.