Viewed products

AWWA ACE68641

AWWA ACE68641 Pilot Testing of Dissolved Air Flotation and Inclined Plate Settlers at Charleston's 118 MGD Hanahan Water Treatment Plant

Conference Proceeding by American Water Works Association, 11/01/2008

Hargette, Paul; Budd, George; Ladd, Jonathan; Shealy, Clint; Benjamin, Don; Byrne, Jane

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This powerpoint presentation begins by providing background information on the Hanahan Water Treatment Plant in Charleston, South Carolina. Objectives of a pilot testing program included:verify bench-scale coagulation conditions;monitor performance of pilot units;determine impacts of various loading rates(settled water quality andfilterability);determine optimal clarification operating conditions;evaluate performance of dual-media filters;evaluate clarification and filtration performance for removal ofturbidity,TOC, UVsub254/sub, andapparent color; and,evaluate the operational robustness of each unit. The presentation presents comparisons of: clarification; filtration; organics removal; and, optimal run. A technical and economic evaluation presents the following topics: LeopoldClari-DAF; IDI AquaDAF; MRI Plates; project costs; operating costs; and, 20-year present worth costs. Presentation summary of findings includes:overall treatment -- all three processes could provideacceptable treatment at optimized conditions;flocculation --fragile floc created challenging issues for all processes, longer floc times required than often seen, andfloc aid polymer important, particularly for plate settlers;plate settlers had higher median headloss rate (in/hr)than the DAF units in winter testing, in summer testingmedian headloss rates were similar; loading rates of approximately 6 gpm/sf (Leopold), 8gpm/sf (IDI), and 0.25 gpm/sf (MRI) are appropriate. Atthese loading rates, the plate settlers had the lowestcapital, operation and maintenance (Outilize plate settler technology at a loading rate of 0.25gpm/sf for future clarification basins --good process performance during pilot testing,familiarity of plant staff with process,lowest capital and O

Product Details

Edition: Vol. - No. Published: 11/01/2008 Number of Pages: 36File Size: 1 file , 3.5 MB

Contact us