AWWA ACE68881 Start-up of a 167 MGD Ozone Facility

Conference Proceeding by American Water Works Association, 11/01/2008

McMeen, Chris; Odell, Lee

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This powerpoint presentation begins by providing a brief overview of Tacoma Water and a schematic of the Green Rivertreatment operations. Major ozone drivers are presented, along with system components, ozone injecting and contacting, start-up issues and functional testing, side stream injection, solution of upstream off-gas, ozone equipment issues with gaskets, liquid oxygen pressure build, and gas flow control. Presentation observations include the following:start-up is a multiphase process;involvement and communicationwith operators is critical; and,people want to go home - mustplan (and specify) accordingly. Includes figures.