Viewed products

AWWA ACE68605

AWWA ACE68605 From Chaos to Crisis to Kumbaya

Conference Proceeding by American Water Works Association, 11/01/2008

Dickson, Mark

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This powerpoint presentation presents Alternate Project Delivery (APD) methods which were developedto address weaknesses in the traditional design-bid-build(D-B-B) delivery method. Advantages of APD methods are provided, along with APD challenges, APD contact information, and increased owner control.

Contact us