Viewed products

AWWA ACE65105

AWWA ACE65105 Bid Day - Calm, Chaos, or Calamity: Who Sets the Tone?

Conference Proceeding by American Water Works Association, 06/01/2007

Spofford, Paul

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This powerpoint presentation asks the question: "How can Owners/Engineers procure equipment or systems from qualified suppliers on a competitive basis without the method of procurement itself becoming an impediment to the success of the project?" It lists the required components of a procurement method, or bid form, and discusses bid form options that include: Conventional Open Bid;Base Bid;Base Bid + Deductive Alternate(s);Evaluated Bid; and, Pre-Selection Bid.

Contact us