Viewed products

AWWA ACE65092

AWWA ACE65092 Using Risk and Criticality for Large-Diameter Pipeline Asset Management

Conference Proceeding by American Water Works Association, 06/01/2007

Habibian, Ahmad; Phillips, Scott; Edwards, Jerry

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This slide presentation outlines an effort to use risk and criticality for asset management of a large-diameter pipeline. The asset management continuous life cycle is presented first, along with the objectives of a large-diameter pipe assessmentprogram that include:failure prevention;which lines to inspect;frequency, technology, cost;which lines to protect;technology, cost, schedule; and,which lines to replace or rehabilitate;technology, cost, schedule. The presentation compares a large-diameter program vs. a small-diameter program. Risk assessment/management is presented in terms of likelihood of failure and consequences of failure. Further topics outlined include: program development for large mains; Examples of Pipe Classification forAssessment Plan Development; Elements of an Assessment Plan; Case Study - DWUInventory of Large Diameter Mains; Recommended Inspection TechniquesPCCP and Steel Pipe; Soil Sampling Soil Characteristics; Prioritized 10-Year Program - 36-inch Inspection Recommendations Small-diameter vs. Large-diameterBudget Recommendations (10-year average); and, lessons learned. Includes tables, figures.

Contact us