Viewed products

AWWA MTC61084

AWWA MTC61084 I'll Take a Double Order of Membranes, Extra Value, Hold the Problems Please: Lessons Learned in Membrane Procurement

Conference Proceeding by American Water Works Association, 03/01/2005

Pappas, Karen; Pressman, Jonathan

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This slide presentation outlined information on the procurementprocess of Western Canyon RegionalWater Supply Project in Canyon Lake, Texas. Topics covered include: proprietary elements ofmembrane systems; Western Canyonbackground and WTP schematic; procurement alternatives; pilot testing alternatives; maintaining consistency duringnon-continuous testing; first and second 30-day test results offlux, TMP, and temperature; and, be prepared for confirmationtest failure.

Contact us