Viewed products

AWWA ACE54244

AWWA ACE54244 Innovative Design and Process Selection for New Water Source and Supply System

Conference Proceeding by American Water Works Association, 06/01/2001

Ajy, George;Lavinder, Steve;Baughman, Doug;Rivers, Rob

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

Hall County (County), Georgia is one of the fastest growing counties in the metropolitan Atlanta Region. The County is in the process of developing a raw water supply, reservoir and a water treatment plant (Plant) to meet anticipated growth. The source water for the proposed Plant will be a reservoir that is filled from two surface water sources. The objectives of this paper focus on the development of a new water supply and treatment system for the County that addresses the following issues: flood issues at the raw water pump station site; strict water withdrawal and minimum release requirements from the raw waterintake; wide variation in the raw water quality; concerns associated with runoff quality due to land use; wide variations in the water level in the proposed storage reservoir; current and future drinking water regulations; and, future increase in system demands and required Plant capacity. Includes table.

Contact us