Viewed products

AWWA MTC53816

AWWA MTC53816 Innovative Two Stage Membrane Design Provides Efficient Solution for Meeting Immediate Water Needs: Case Study--City of Georgetown Southside WTP

Conference Proceeding by American Water Works Association, 05/01/2001

Lynk, Steven V.;Briggs, Jim H.;Petry, Marc

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

The City of Georgetown, Texas located approximately 40 miles north of Austin,Texas has experienced tremendous growth over the last ten years. Since 1990,Georgetown's population has more than doubled from 15,000 to nearly 33,000 in theyear 2000. This growth is projected to continue at a rate of approximately sevenpercent per year. As the population grows in the community, so does the demandfor water and wastewater services. Due to the population growth, the City neededan expansion to meet projected water demands before the summer of 2000. CampDresser however, the results are not intended to be part of this paper and areonly briefly discussed. Based on the pilot study results, the City/ CDM initiateda high tech selection process to select the membrane equipment best suited forthe project. Following the selection of membrane equipmentmanufacturers--Aquasource North America (AquaNA), CDM began the design phase ofthe project in July 1999. Includes 3 references, tables, figures.

Contact us