Viewed products

AWWA MTC50289

AWWA MTC50289 How Will Public Water Systems Acquire the Expertise to Operate and Maintain Membrane Plants?

Conference Proceeding by American Water Works Association, 01/01/1999

Noack, Roger K.;Hubbard, Shelle;Emami, Jay;Geischecker, Edward P.

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

The purpose of this paper is to describe the requirements of the Service and Maintenance Contract used for developing in-house experise by training personnel with the help of the manufacturer. To insure help with this training, the Brazos River Authority required that the electrodialysis reversal (EDR) manufacturer enter into a Service and Maintenance Contract for a period of ten years. The advantages and disadvantages of the contract from the Authority's and the manufacturer's perspectives will be presented.

Contact us